Size Guide
Match the project, then check the weight. Volume picks the box for household debris; weight picks it for concrete, dirt, shingles and plaster. This guide covers both — then each size page goes deeper.
| Size | Dimensions | Pickup loads | Best for |
|---|---|---|---|
| 10 yard | 14′ × 7.5′ × 3.5′ | ~3 | Concrete, dirt, shingles, bath remodel, garage |
| 15 yard | 16′ × 7.5′ × 4.5′ | ~4–5 | Flooring, one-room remodels, medium cleanouts |
| 20 yard | 22′ × 7.5′ × 4.5′ | ~6 | Kitchens, roofing, whole-home cleanouts ⭐ |
| 30 yard | 22′ × 7.5′ × 6′ | ~9 | Construction, additions, estate cleanouts |
| 40 yard | 22′ × 7.5′ × 8′ | ~12 | Commercial and demolition volume |
| Project | Start here |
|---|---|
| Single bathroom remodel | 10 yard (15 if tile + tub + plaster) |
| Kitchen remodel | 20 yard |
| Roof tear-off | 10–20 yard by squares & layers — see the roofing page |
| Garage / basement cleanout | 10–15 yard |
| Whole-home / estate cleanout | 20–30 yard |
| Concrete or dirt removal | 10 yard dedicated — always |
| New construction / addition | 30–40 yard |
Still torn between two sizes? Take the bigger one when the debris is light and the project is still growing — remodels generate more debris than anyone plans for, and a second delivery costs more than the step up. Take the smaller one when the load is heavy, when the driveway is short, or when the job is truly one room. And when in doubt, call: we'd rather size you down honestly than rent you air.
Household debris — furniture, cabinets, flooring, boxes from a life being sorted — is bulky and light. For those jobs you shop by volume: how much space does the pile need? Dense debris plays by different rules. Concrete, dirt, brick, shingles and wet plaster can hit a container's weight limit while the box still looks half empty. Decide which kind of job you have first, and half the sizing mistakes in Berks County never happen.
Mixed loads are where people get hurt: a remodel that is ninety percent light debris and ten percent concrete rubble is a weight job in disguise. Pull the dense material out — one dedicated small load for the heavy fraction, one right-sized box for the rest — and both price the way they should.
The pickup-load column in the table is the fastest honest estimator we know. A standard pickup bed holds roughly two to two-and-a-half cubic yards heaped. Picture your debris as truck beds: a garage cleanout is usually three to five, a kitchen four to six, a whole-home cleanout ten or more. Match that count to the table and you're within one size of right — then let weight veto the answer if the load is dense.
Room by room, the pattern repeats: a bathroom is a 10-yard job until tile, a cast-iron tub and plaster push it to a 15. A kitchen is a 20. A roof is arithmetic, not volume — squares and layers, worked out on the roofing page. An estate is a 20 until the attic and basement join in, then a 30 earns its keep.
Every size is the same width — about seven and a half feet — so driveways are rarely the problem. Length and overhead are. The truck needs roughly sixty feet of clear approach to set a box down, and twenty-three to twenty-five feet of vertical clearance to tilt it off. A 40-yard is twenty-two feet long with eight-foot walls; a 10-yard is fourteen feet and loads like a pickup bed. Low wires, tight Reading alleys and soft ground are the usual complications — all solvable, all worth mentioning on the call. Every box goes down on boards, which also keeps a loaded container from printing its weight into hot asphalt.
One placement follows different paperwork: if the box has to sit on a public street or alley in Reading rather than a driveway, the City permit needs sorting before delivery day. The driveway-versus-street decision is worth making on the call — not at the curb with the truck idling.
A 20-yard, in most Berks kitchens. Cabinets, counters, flooring and appliances from an average kitchen fill roughly six pickup loads. Small galley kitchens sometimes fit a 15; plaster-and-lath kitchens in older Reading homes run heavy — mention it when you call.
It goes by squares and layers, not by eye. A 20-yard handles most single-layer tear-offs up to about 20–25 squares; smaller roofs often fit a 10. The roofing page has the full squares-to-size breakdown.
Don't. Concrete prices by weight and needs a dedicated 10-yard load; mixed into a household box it blows the weight allowance while the box looks half empty. Two right-sized loads cost less than one overweight one.
Call before you fill it. Swapping an empty or barely-started box is routine; the expensive version is a heaped, overweight box that can't legally travel. If a project outgrows its container mid-job, a swap-out is the normal fix.
Level with the top rail — no higher. Anything heaped above the rim has to come off before the truck can legally haul it. Load heavy items first and distribute the weight evenly end to end.
About seven days is the standard rental period for any size, with shorter and longer periods arranged up front and per-day extensions a phone call away.
Not sure which size? Call and describe the job — we'll size it honestly.